| Residential |
| R-01 | Visit: quote, material info, report. | $60 | $150 |
| R-02 | New electrical work: house, condo. | $1,540 | $8,740 |
| R-03 | Ceiling fan: living room, bedroom. | $140 | $350 |
| R-04 | Electrical wiring: new house, old house. | $1,500 | $10,000 |
| R-05 | New circuit: washer, dryer, dishwasher. | $200 | $300 |
| R-06 | Electrical circuit: pools, jacuzzi, spa. | $250 | $980 |
| R-07 | Electrical panel: new, restoration. | $520 | $4,000 |
| R-08 | Grounding: installation, maintenance. | $420 | $1,760 |
| Lighting |
| I-01 | Switch: installation, replacement. | $100 | $200 |
| I-02 | Dimmer: installation, replacement. | $120 | $250 |
| I-03 | Home automation lighting control. | $250 | $1,200 |
| I-04 | Light fixture: replacement, repair, LED, unit. | $100 | $200 |
| I-05 | DIALUX design. | $200 | $500 |
| I-06 | Exterior: garden, facade, christmas lights. | $120 | $2,000 |
| Electric Vehicle Charger |
| C-01 | Conduit: tubing, box, breaker. | $120 | $250 |
| C-02 | Wiring circuit to equipment. | $250 | $400 |
| C-03 | Equipment installation, final testing. | $70 | $100 |
| C-04 | Incentive program. | $60 | $100 |
| Solar Panels |
| S-01 | Calculation, sizing, proposal. | $80 | $500 |
| S-02 | Installation: panels, storage. | $1,500 | $15,000 |
| S-03 | Final testing, commissioning, incentive. | $150 | $300 |
| Commercial |
| EC-01 | Review of plans, calculation, proposal. | $200 | $500 |
| EC-02 | Remodeling, new, system expansion. | $450 | $2,550 |
| EC-03 | Electrical panel: new restoration. | $200 | $5,000 |
| EC-04 | Commercial grounding: redesign and installation. | $420 | $1,760 |
| Commercial Lighting |
| IC-01 | Commercial DIALUX calculation. | $200 | $6,000 |
| IC-02 | Repair of existing systems. | $250 | $1,500 |
| IC-03 | Installation: emergency lights, backup. | $250 | $9,580 |
| IC-04 | Illuminated sign: design, mounting, repair. | $120 | $2,250 |
| Electrical Vehicle |
| CV-01 | Calculation, sizing, proposal. | $450 | $1,120 |
| CV-02 | Charging station. | $250 | $4,500 |
| CV-03 | Installation: panels, storage. | $1,000 | $10,000 |
| CV-04 | Final testing, commissioning, incentive. | $100 | $10,000 |